The project is located along the highway near the newly built energy storage and hydropower station in Fengning, Chengde, Hebei. The target slope is an artificial slope which was formed because of highway excavation. This slope is rather steep whose surface is covered by loose rocks. In this condition, anchor installation for active net is very difficult. Thus curtain-type net is adopted according to the actual conditions.